Ga naar inhoud
Usually a response within 1 business day

Rush: fast production of sheet parts (laser & CNC)

Short answer: yes, Milplex can produce sheet parts at speed — often within 24–48 hours after a short technical check. Rush means we shift other production or work overtime, so a surcharge applies (typically +15% faster than planning, +25% within 48 hours, +40% same day where possible). Send your file and we confirm feasibility and lead time within 1 business day.

When is rush feasible?

  • Production-ready file (DXF/DWG/PDF) or a clear sketch.
  • Material in stock or quickly available — we check immediately.
  • Realistic scope: rush works best for well-defined cutting/milling.

What to supply for a fast quote

  • Material + thickness (or let us advise).
  • Dimensions and quantities.
  • Deadline (date + time).
  • File or sketch.

Frequently asked questions

Can Milplex produce at rush speed?

Yes, often within 24–48 hours after a short technical check, depending on material availability and scope.

What does rush cost?

A surcharge, typically +15% faster than planning, +25% within 48 hours and +40% same day where possible.

What should I supply for rush?

A production-ready file (or clear sketch), material/thickness, dimensions, quantities and the deadline.

From idea to production

Send your project, material question or drawing today.

Milplex helps with material selection, file review and a clear next step towards quote or production. Prefer to align first? Call or email directly.

  • Usually a response within 1 business day
  • Workshop visit by appointment
  • De Rijn 7C, 5684 PJ Best
Quote Call Materials Capabilities
Scroll to Top
WhatsApp