Short answer: yes, Milplex can produce sheet parts at speed — often within 24–48 hours after a short technical check. Rush means we shift other production or work overtime, so a surcharge applies (typically +15% faster than planning, +25% within 48 hours, +40% same day where possible). Send your file and we confirm feasibility and lead time within 1 business day.
When is rush feasible?
- Production-ready file (DXF/DWG/PDF) or a clear sketch.
- Material in stock or quickly available — we check immediately.
- Realistic scope: rush works best for well-defined cutting/milling.
What to supply for a fast quote
- Material + thickness (or let us advise).
- Dimensions and quantities.
- Deadline (date + time).
- File or sketch.
Frequently asked questions
Can Milplex produce at rush speed?
Yes, often within 24–48 hours after a short technical check, depending on material availability and scope.
What does rush cost?
A surcharge, typically +15% faster than planning, +25% within 48 hours and +40% same day where possible.
What should I supply for rush?
A production-ready file (or clear sketch), material/thickness, dimensions, quantities and the deadline.
